I knew the floor plan of this bathroom needed to change.  There was a huge waste of space next to the toilet, only 1 tiny sink that had barely any door clearance and a shower so tiny that the kids would have out grown it by the time they reached puberty! That combined with the leak and frozen pipes made this room a priority.  (I was secretly hoping to do the main/master bath or kitchen first but the house apparently had other plans!  Oh well!)

I consulted the local kitchen and bath design specialist  they came out took measurements and asked what I wanted to see in the bathroom. I  explained that I wanted something that went with the feel/ age of the house.  I wanted to put 40 inch wainscoting on the walls, find a way to fit 2 sinks (because 5 kids crammed around 1 tiny sink in the mornings and evenings to brush their teeth just wasn’t ideal!), and frame-less glass shower doors with a tiled surround and a glass accent at eye level.  I explained I would like the vanity to have a furniture feel to it, and the 3 things I would love  to have would be a separate water closet for the toilet, so someone could pee in privacy while the others did teeth brushing and such; If we could find a way to make the shower become a tub that would be great but if we couldn’t a neo-angle shower would be fine and what ever storage we could add would be perfect!

Then my contractor who needed to measure doors for all the new closets and replacement doors happened by, he asked what was going on with the bathroom (since we had started demoing it at this point) and I explained everything I had told the design specialists.  He looked at the space for maybe a whole 5 minutes and came back with a great new design plan!  To move the door, to the opposite wall put a tub/ shower in and a pocket door to make a water closet and then tuck a double sink in where the existing door had been.   Honestly it was a perfect plan!  But I still wanted to wait until I heard back from the specialists.  I waited over 2 weeks for their reply.

They called on a Thursday I went over Friday morning to take a look at what they came up with I was super excited, until I saw their plan, my heart dropped.  They didn’t give me a double sink.  They didn’t give me a water closet.  They didn’t give me a bathtub.  What did they give me?  A 18 inch linen closet.  And a budget 10 x more than I had said I wanted to spend (and 5 times more than my contractor said it would cost).  It was super disappointing , 2 weeks of waiting, nothing I wanted or needed in the space,  and a budget bigger than I have for the whole house remodel!  It wasn’t full of high-end granite, or vessel sinks, (both which the tall Man has banned from our house! lol) Kohler accessories  or new modern innovations and striking designs.  It was simple and boring, and costly.  I called my contractor on the way home to tell him he got the bathroom job, I didn’t even bother to call the Tall Man first because I knew he would agree with my decision and we wanted the bathroom done, and done now.

We did some of the demo ourselves before the contractor came in to save some on costs and to be involved in.  Tall man and the boys #1 and #3 demo’d the trim and the flooring.  We sold the vanity on Craigslist and took it out when the couple arrived to pick it up, and I demo’d the shower and removed the light fixture and wall decor.  Then our contractor came in and made short work out of gutting the rest of the place.  By the end of day 2 demo was pretty much done and some improvements had been begun.

One week into the job, new insulation is already being installed in the wall, the  old plumbing has been removed, the walls have been leveled out and the floor leveling is underway (the floor is being leveled for the bathroom and the adjacent toy room simultaneously as they share the same floor joists).  I can’t wait to see what progress happens this week!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s